27.01.2021
JINDAL ALUMINIUM LIMITED
(Rolling Division)
5th Amendment to General Procedure dated 20A.2020
1. Under Part I "Procedure for preparation of requisition/indent, approval of OFS etc." on
page 7, under point no. "e" "Approval of Contracts of Civil Works" shall be substituted as
follows:
SI.No. Limit
Approving authority
Up to Rs.10,000/- each
(up to a
1
SKJ
mm
aa
xx
ii
mm
uu
mm
of Rs.1 lakh per month)
2
Above Rs.10,000/- up to 50,000/-
AD+DS in addition to (1) above
3
Above Rs.50,000/- up to 2,00,000/-
DM in addition to (2) above
4
Above Rs.2,00,000/- up to 10,00,000/-
NM in addition to (3) above
5
Above Rs.10,00,000/-
VCMD in addition to (4)
2. Part XIII "Procedure for Construction Works", from page No.85 to 95, shall be substituted
as follows:
"PART XIII
I. Procedure for Construction Work(Overall In-charge SKJ1
a. Civil Works
i.
SSJ for JAL D/F side and in his absence AD will be overall in-charge of entire
construction dept. under SKJ and will ensure correct and timely completion of
all civil works as per plans and instructions. SSJ will take at least 3-4 rounds
for general checking daily, covering entire construction sites. SSJ will be fully
responsible for arranging entire construction materials, store items
(proper
ordering, quantity and quality etc.). SKJ will ensure full security and honesty by
all as also will ensure best quality of work and timely completion. He should
take action against the contractor for substandard work and for the delay in
completion of the work. HG will keep check on all matters in all respects and
can take any action.
ii.
B/F Drawing office will prepare drawings as per guidance of SSJ which should
be approved by HG/AD/NM with complete dimensions and give to contractor
positively within
7 days of finalization of the contract. If there is any delay,
SKJ/HG to keep check and take action on SSJ after ascertaining reason for the
delay.
iii.
SKJ will take at least two rounds daily for general checking covering entire
construction site. Similarly, HG will also take 2-3 rounds in a week of all
construction sites and take action for any lapses, losses, extravagance, poor
quality work etc.
iv.
SKJ will attend to the problems and will give on the spot solution if
consultation with any other person is not needed. In other cases, he will
expedite only after consulting the concerned person. SKJ/HG will depute any
person from accounts/IAD department, who will assist SSJ in taking
measurements, making payments to contractors etc.
1
v.
HG and SKJ will ensure honesty in all respects - specially at critical stages like
purchases, receipt of materials, safety and proper utilisation etc. NM/DM may
change the procedure/ rules if they so deem fit and bring to the notice of
VCMD/CMD Saheb subsequently. They must ensure that material used is of
best quality and the quality of work is also good. There should be no
compromise at all in these aspects.
b.
Note:
i. Measurement of any construction work should be done separately by SSJ
and IAD/Accounts persons as far as possible. Only in case of unavoidable
circumstances, measurement can be done together by them.
ii. All supervisors will ensure that entire construction work is carried out
correctly as per plans and instructions
(amended from time to time)
properly and economically. No deviation or breaking, wasting of materials
causing financial loss shall be allowed without due approval. SKJ shall
keep watch and punish concerned supervisors, if he finds such lapses.
iii.
In respect of contract works, a note book shall be maintained at each site
and supervisor/checking person shall note down in the same, the details of
deviation/mistake/loss etc. SSJ shall check and sign the note book
maintained and take necessary action for recovery of loss from contractors
or take up with them for rectification, in consultation with SKJ. This note
book will also be checked by SKJ once a week and will take strict action
for any loss.
iv. All care should be taken and suitable instructions should be given to all
supervisors. SSJ will be fully responsible for execution including planning
and
completion of all civil construction works. They will consult SKJ, HG
from time to time and Architect/Structural Engineer
(wherever and
whenever necessary). SSJ should get the plans and details of
construction well in advance and prepare requirement of construction
materials beforehand so that no worker sits idle at site.
v. Architect should also visit as and when required and ensure that the work
is going on as per the drawings. Structural Engineer/Architect's visit will be
arranged by SSJ in consultation with SKJ and a record to this effect will be
maintained for the purpose of payments made to them. Payment for
consultants shall be made with the approval of SKJ/HG only.
vi.
As far as possible, all construction works should be given on contract.
However, SSJ/AD to keep strict supervision to ensure best quality and
timely completion of the works. SKJ/HG also to check the quality of work
done by the contractors and take action against our supervisors if they
are not checking the quality properly.
vii.
Guidelines for construction work given on contract (including for
institutions) as outlined in this procedure shall be strictly followed.
2
II. Electrical and Maintenance (Non-Plant) All Types - Sanitary, Water Supply
Etc.
i.
Somashekar Dy Manager Non Plant Maintenance will be responsible for
proper installation and completion of electrical and plumbing works. He will
take care right from the initial stage including materials indenting. He is fully
responsible for all such activities till the work is satisfactorily completed.
Somashekar in consultation with SSJ/SKJ will supervise entire plumbing and
electrification works. They shall prepare complete wiring layout duly approved
by NM/DS in advance to avoid any change and alterations afterwards. They
shall prepare requirements and order for all the electrical and plumbing items
well in advance through stores in consultation with SKJ. They will ensure that
correct quantity
and
good
quality
material
is
purchased
and
electrical/plumbing work is completed well in time. For every specific project
Somashekar H.B should take specific brand approval from SKJ/HG. In case
the contract is given with supply of material also, then to ensure that they are
using the material of required quality as per the contract.
Furnishings and Decoration
As soon as the finishing stage is reached, SSJ/SKJ will attend to various
furnishings and decorations in consultation with NM and interior decorator (if
necessary). The approved drawings/plans should be kept ready in advance so
that the work is not delayed.
IV. Guidelines for Construction Work Given On Contract (Including for
Institutions)
a. SSJ and AD will prepare an estimate of cost of construction of any particular
work and will hand over the same to SKJ together with drawings duly
approved by HG/DM/NMNCMD. It must be ensured that the estimate is
realistic based on drawings and rates are as per prevailing market rates. One
copy of such estimate should be signed by SKJ/HG while finalizing the order
and kept in file along with the work order.
b. Construction supervisor shall prepare indent for different items required and
take approval as follows:
SI.No.
Limit
Approving Authority
(a)
Up to Rs.10,000/-
SSJ / Praveen Agarwal
(b)
Above
Rs.10,000/-
As in (a) above + SKJ / HG+
and
up
to
AD
Rs.1,50,000/-
(c)
Above Rs.1,50,000/-
As
in
(b)
above
+
SKJ/HG/SKP + DM/NM
AL/AD/SKJ will thereafter call for quotations from contractors
(minimum
three) for supply of material, whereas for giving work on contract, AD/DS will
call for quotation.
c. After collecting all the details, SKJ will prepare a comparative chart showing
details of name of contractor, estimates given by each contractor item-wise,
estimates made by SSJ and put up the same to SKJ along with copy of
approved drawing.
3
d. NM will then ask SKJ/HG/AD/DS to negotiate with the parties regarding rates,
time-schedule for completion of work, quality of work, drawings etc. SKJ/HG
shall negotiate with the parties deeply and repeatedly to bring down their
quoted rates.
e. After this they will tabulate a comparative chart properly giving all details and
take approval as under:
Approving
SI.No
Limit
Authority
Up to Rs.10,000/- each
(up to a
1
SKJ/HG
maximum of Rs.1 lakh per month)
AD+DS in addition
2
Above Rs.10,000/- up to Rs.50,000/-
to (1) above
DM in addition to (2)
3
Above Rs.50,000/- up to Rs.2,00,000/-
above
Above
Rs.2,00,000/-
up
to
NM in addition to (3)
4
Rs.10,00,000/-
above
VCMD in addition to
5
Above Rs.10,00,000/-
(4)
f.
The work order issued to the contractor containing specifications such as
masonry work, brick work and other connected works, schedule for
completion, terms of payment, penalty clause, retention amount/period and
set of drawings approved by HG/DM/NM should be checked and
countersigned by SSJ for technical matters and SKJ for commercial matters.
DS or NM are authorised to sign work orders. Signature of the contractor with
date and seal should be obtained on the copy of the work order and drawings
as a token of his acceptance and it should be kept with SKJ in file.
g.No change should be made in the drawing in any case. If required, a new
revised drawing should be made with the approval of SKJ/HG & DM/NM (two
persons). For any major changes, approval should be taken from VCMD. The
approval should be obtained by SSJ on a separate note with sufficient reason
for revision. The new revised drawing should bear the same serial number as
the earlier relevant drawing with A, B, C etc. added along with the number and
date to indicate the revision, e.g. if the earlier drawing bears the No.125, the
new revised drawings will bear the No.125A,
125B and so on with date.
h. All the final drawings must be approved and signed by DM/NM/KRRNCMD.
Unapproved drawings should not be given to the contractor. Civil drawings
should be approved by DM/NM/KRRNCMD before the same are issued to the
contractor. These drawings shall also be given to the supervisors for guidance
and reference.
i.
Whenever any modification is required in the drawing already approved, DS
should get the same approved from DM/NM//KRR/VCMD.
Supervisors should not allow the contractors to use any kind of sub-standard
materials in the construction and the supervisors are authorised to reject sub-
standard material and to stop the work and inform SSJ/SKJ immediately.
SKJ/HG will surprise check and punish the supervisors if found wanting.
4
k. SSJ and AD will be completely involved in the construction work and will be
responsible for inspection of raw materials like cement, sand, jelly, stones,
bricks, paint items etc. They should ensure that workmanship/finishing is
good. They should take action against the contractor if the quality of work
being done is not good and deduct the amount to that extent from his bill.
Subsequently, if there is any change in the specification of the contract given,
such as change in thickness, mixing, material, increased/decreased quantity,
SSJ/PA/AD should inform SKJ/HG, who after assessing the necessity of such
changes, will discuss with contractor to increase/decrease the rates already
decided earlier and the rates will accordingly be revised with the approval of
DM/NMNCMD. Rates for any new item must be fixed in advance before work
is started and should not be negotiated while settling the bill.
m. Part payments against the progress will be made to the contractors as per the
work order after the approval of SSJ/AD + SKJ/HG + NM/DS. The quantum of
work done will be measured by Accounts personnel with the help of site
supervisor and quality of work will be certified by SSJ.
n. Payment for extra works other than specified in work orders, if any, as per site
conditions will be made after physical verification by SSJ/AD
+ SKJ/HG.
However, rate and charges if any must be decided with the approval of
DS/DM/NM within 3 days.
o. Final payment of
10% or 5% will be made to the contractor after warranty
period or as agreed and with satisfactory inspection and measurements by
SSJ + AD+ SKJ/HG+ NM/DM (4 persons). For delay in completion of work,
penalty as mentioned in the work order must be deducted.
p.
In case of any change in thickness of RCC, specification of any size or
material, wherever contract is given on sq.ft. basis, SSJ must inform
(immediately at the time of making change) SKJ/HG so that rate can be
reduced or changed accordingly.
q.
Supervisors, AD, SSJ, PA and SKJ, while taking rounds will ensure that our
own items such as cement, jelly, paint and steel lying in the campus are not
mixed up with that of contractor's materials and used by them. If any such
thing is noticed. SKJ should take strict action and HG will also check the same
during his surprise visits.
r.
Whenever the contract is given on item-wise rate basis, particularly for new
buildings, measurement by Accounts
+ IAD person should be done before
covering foundation to avoid any dispute later. This will be responsibility of
SSJ/AD.
s. All supervisors - SSJ/SKJ should ensure that:
i.
The contractor deploys sufficient manpower according to the need of the
work or as mentioned in Contract Order to complete it timely.
ii.
The labour deployed must be trained to do quality work - otherwise asks
the contractor to change inefficient labour.
iii. The progress of the work must be as per schedule - if it is behind schedule, to
inform DS/DM/NM so that they direct the contractor to improve their working.
5
iv. The rate of any major item not decided earlier must be decided immediately
before work is started.
v. Measurement of the completed work should be made timely so that there is
no dispute once the work is completed. Measurement must be completed
within 7 days as per the procedure.
vi. As far as possible, contract for all works including plumbing, painting,
electrical, tiles, sanitary works etc. should be given to the same contractor.
vii. Quality of material and mixing are as per standard/order given to the
contractor.
V. OTHERS
i.
Construction Supervision Work (In-Charqe AD/SSJ):
SSJ will be in charge of all supervisors. They will ensure that all supervisors
under them take full work from the labourers / contractors working under each of
them and see that none of them remains idle. If any worker is not performing
his/her work in proper manner, concerned supervisor should sack such worker or
mark absent for one day as punishment so that in future, he will work with full
speed and care. SSJ is also expected to take action against supervisors for not
monitoring the workers properly.
All supervisors will see that the work is carried out as per the
instructions/guidelines and see that no construction or stores material is misused
or wasted by any worker nor will allow any worker to sit idle. SSJ
/ AD
Supervisors will also check the quality of work being done by the contractors.
They will also ensure that no excess items are indented for any work.
It must be ensured by SKJ / HG that wages fixed to construction workers/ masons
etc. are as per grading fixed and as shown in the approved list. Grading of
labourers should be reviewed constantly and wages should be fixed accordingly.
ii.
Purchase Of Construction Materials (SSJ):
On getting the requirement from SSJ & AD who should give the same in advance,
SKJ and HG will settle the rates for construction materials which will be finally
settled and approved by AD/DS/DM and NM. A list of such rates and terms duly
approved by AD, DS, NM and DM will be given to Accounts. SSJ will then
immediately place orders for all types of construction materials. The rates for
construction materials should be checked frequently at least once in a
3 months
by SKJ/HG/DM/NM to ensure that higher rates are not charged.
SKJ will ensure that the work does not suffer for want of materials. SSJ will make
frequent visits at site and keep strict and constant watch on all affairs including
quality of materials and construction work. SSJ/AD will arrange construction
materials by visiting the quarries and shops of suppliers. SKJ will check all major
purchases including stores materials by going deep in all respects for any lapses,
dishonesty etc. SKJ, HG and NM will buy best quality (to be decided on case to
case basis) from reputed suppliers as per limits prescribed in JAL general
procedure.
6
iii. Purchase Of Stores Materials - SKM On JAL DIF Side:
SSJ/AD will give the stores item requirements to SKJ/HG, who will scrutinize the
requirements and then forward to storekeeper, who will further scrutinize the
requirements and then forward to SKM for arranging purchase as per the
procedure prescribed separately. For major purchases, SKM will consult DS/NM
also.
Storekeeper and all others will ensure that the requirements are genuine and
goods ordered are already not lying in stock. Accounts will also verify/compare
the rates of goods purchased with the last purchase and put remarks wherever
necessary. SKM will arrange local purchases through purchasers and will ensure
to get maximum discount from local suppliers.
In addition to the regular
discount, they should get cash/trade discount. Since the material is mainly meant
for charitable purposes, they should try for additional special discount. Items
should be procured as per delivery period maintained in the indents.
Efforts should be made to purchase bulk items like cement, steel, painting
materials etc. directly from the manufacturers or wholesale dealers and to avail
maximum discount.
iv. Receipt And Consumption Of Construction Materials:
The construction materials such as cement, sand, steel, wood, jelly, bricks,
boulders, stones etc. will be received by any senior construction supervisor at
site and shall be physically checked by construction supervisor
+ SSJ/AD +
Stores
+ SKJ
+ Accounts Officer will countercheck and sign. They will put
remarks in case of any discrepancy.
SSJ will ensure proper consumption of materials and SKJ/HG will take suitable
action for any misuse/wastage. SSJ will ensure that no material is misused by
any worker. Security guard will keep a separate book for construction material
received. SSJ will also circulate the site wise consumption report to SKJ/HG on a
monthly basis.
v. Receipt And issue Of Stores Materials:
a. Storekeeper will be solely responsible for keeping proper record of all
materials received who will also keep proper record of goods returned to
parties or sent for replacement.
b. Goods Return Challans will be signed by storekeeper and Purchaser. All
cash memos and bills will be signed by store-keeper in respect of quantity.
c.
SSJ/AD or any other senior person will verify the quality. Final passing of bills
will be done as per JAL B/F Procedure. Store will circulate monthly report to
SKJ regarding unused civil items for taking further action.
d. Whenever materials are returned by the workers to stores, the storekeeper
will make receipt entry in the bin card and stores ledger so that at any point
of time the physical stock tallies with the stores records.
e.
During every week, particularly on Sunday, the construction supervisor on
duty will take physical stock of all construction items / equipments such as
mumty, pick-axe, bandli etc. and see that no item is missing. This physical
7
stock should be entered in a note book and should be shown to SSJ for
their checking and taking action for lapses if any. SKJ to check this book
once in a week and take action for any lapses.
f.
The stores material will be issued only on requisition from supervisors
through ERP which should be authorised by SSJ & in his absence by AD and
supervisors will accompany the workers for getting the major items issued
from the stores costing more than Rs.5,000/- and the storekeeper will make
proper entry of all materials issued. The materials issued will be verified by
persons specified for verification of end use of items as per JAL D/F
procedures, who will report to HG in case of any discrepancy.
g. Storekeeper will ensure that major items costing more than Rs.5,000/- issued
from Stores are properly utilized for the purpose for which they were issued.
For this, he will go to the site and physically check whether all the major
items issued are properly and fully used or not and put his signature in the
register after checking and entry. In respect of items costing less than
Rs.5,000/-, the concerned supervisors will check that the material issued are
utilized properly.
h.
All signatories should put suitable remarks in bills and cash memos in case
there is any discrepancy in quality and quantity without any pressure or fear.
SKJ / HG will take suitable action and clear the remarks. No person will sign
without proper verification. SKJ/HG will check stores with register and also
fully check the materials like bricks, sand etc. received by truck loads
periodically. SSJ/SKJ will ensure that the materials are received in time and
used economically without any wastage. Stores will be under Stores
Manager who will ensure proper checking in all respects. They should also
check the quality of construction material. If any item particularly bricks,
sand, jelly are found to be of poor quality, the same should be rejected and
returned.
i.
A list of dead stock items which are lying in stores should be sent to
SSJ/SKJ/SKP/HG once in a quarter by the Storekeeper and the same be
disposed of by the same persons who do so for by-products sale in JAL B/F
(or returned to party through Purchase dept). Also to circulate the list to
AD/DVRNP/DS in BF to check with them, if they can consume any item.
vi. Painting:
a. SKJ will be in charge for entire painting work assisted by SSJ/AD and
supervisors. Best quality paint should be purchased directly from
manufacturers as far as possible. All bills shall be checked by SKM for rates.
All must ensure best quality. A separate paint register shall be maintained by
the supervisor with respect to contract work only for the entire campus
recording progress of work, materials consumed etc.
b. Empty tins, bottles, drums, bags should be returned to stores after use.
Storekeeper should ensure that all empty tins and bags are received back
after use. He should also visit the site. Painting progress register should be
circulated by SSJ to SKJ/HG for their verification. HG will oversee in all
respects to check quality and dishonesty anywhere (contracts, purchases,
theft, misuse etc.).
8
c. Painting jobs must be given on labour contract basis only and the quantity of
paint given to the contractor should be checked on the basis of per sq.ft.
coverage obtained per liter of paint to ensure that there is no misuse and
wastage of paint. For such checking, a standard should be obtained from the
paint company and got duly approved by SKM I DS I NM,
d. SKJ/HG/DS/NM will check before finally passing the bill of the painting job
works with standard fixed. One person from Accounts Dept., deputed by
SKJ should be present during measurement of work in view of manipulative
practices adopted by the contractors, they accept contract with materials
only when they use inferior quality and less quantity of paint, which fade out
within a year as happened in the past. When any contractor accepts labour
contract, his tendency is always to make money through other ways like
stealing paint, using more quantity, misuse etc which must not be allowed.
vii. Labour Attendance:
To facilitate recording of attendance of all labourers shall be taken by Praveen
Agarwal + one more Supervisor. Two supervisors must be present while taking
attendances.
This attendance will be taken 3 times a day - once in the morning, afternoon and
evening. They will make note of overtime also, if any. Accounts dept 4Audit dept
will undertake surprise checking once a month to verify the attendance
periodically of all the groups, and seize the attendance book immediately.
SSJ/SKJ will also check whenever they like and punish those who are found not
checking and ignoring duty. They should also ensure that the labours deployed
are hard-working with stamina. If anyone is not found good and over-aged, such
persons should be removed immediately.
Note:
(a) All the workers will sit at the time of attendance and head count will be
done by the supervisor. When their name is called, they will stand and go.
No unnecessary gathering should be allowed.
(b)
A site register indicating the progress of work should be maintained by the
supervisors for contract works. SSJ should check and sign the register
along with
his comments during visits to the site.
(c)
If any worker goes on half day leave, the same should be marked in the
attendance sheet by concerned supervisor.
(d)
Supervisors should be attentive while marking attendance to ensure that
there is no proxy.
(e)
Construction labourers should not be deputed on a permanent basis to
other departments/sites without approval of SKJ/HG.
(f)
Admin dept will surprise check attendance once a month and report to HG
in case of any discrepancy. SSJ/SKJ will also surprise check and punish
those found wanting.
9
viii. Weekly Payment (Cashier):
a.
Supervisors will prepare weekly wages sheet on Friday positively for
attendance up to Thursday (of all the groups) which will be got checked by
Cashier with wage list. Weekly payment will be made by Cashier as follows.
For all construction labourers: Cashier
/ Accounts Dept
+ Construction
Supervisor + Personnel Dept.
b.
Wage payments should be made on Saturday evening. Cashier will give the
amount of weekly payment to concerned staff in correct denomination and
SSJ will supervise the payment of all the groups one by one. SSJ should stay
and watch till last payment, verify the remaining amount and sign. In the
absence of any supervisor, SSJ in consultation with SKJ will arrange another
supervisor for payment purposes. SKJ/HG will also make surprise checks at
the time of payment. Person making payment should be changed once a
month by HG.
Attendance of construction workers will be surprise checked by Pradeep
Singhal and Naresh Garg at least once in a month. They will go to the spot
after the attendance has been taken by construction staff and work has
commenced.
ix. Records/Registers To Be Maintained By Construction Department:
i.
Concrete cube testing report duly signed by SSJ/SKJ as and when issued.
ii.
Progress report register duly circulated to SSJ/SKJ once in a week
for departmental work.
iii.
Painting progress register prepared by supervisors and checked by
SSJ/SKJ once in 15 days if contract work given.
iv.
A site register indicating progress of work for contract works duly
signed by SSJ/SKJ.
v.
Distribution of duties for construction supervisors will be fixed by SSJ and
duty of any supervisor should not be changed without his approval. No
separate register is required, only verbal arrangements.
vi.
Sending samples of construction materials like bricks, steel for laboratory
tests will be arranged by SSJ through Admn. dept whenever feel necessary
on receipt of materials at site. Bricks should be tested internally in our in
house laboratory.
vii.
During testing, if any material is found to be sub-standard, the same should
be rejected immediately and should not be allowed to be used.
viii.
VCMD shall check and approve all construction and contractors' bills above
Rs.10 lakhs.
VI. General Notes
a. Indents should be prepared by the concerned supervisor and countersigned by
SSJ/AD. Before giving indent for purchase of materials, the availability of
10
material should be checked with JNI/JAL Stores. Thereafter, the indents should
be circulated for approval of higher authorities as per procedure. It should be
ensured that no unnecessary item is purchased.
b. SSJ/AD should ensure that the indents for all construction items are given for
correct quantity and sufficiently in advance so that there is no loss to the
company. If any item remains in stock after completion of the work for which it is
purchased, the same should be returned to the supplier as far as possible. In
case any item remains in stock, store keeper should inform to SKJ/HG who shall
take action for the excess items procured and also take action to dispose off the
same. Unused/left over excess materials pertaining to contractors can be taken
out by the contractors with a simple gate pass prepared by the storekeeper. In
such cases, the site supervisor will request the storekeeper to issue a NRGP
certifying that the materials belonging to the contractor. The requisition will be
countersigned by SSJ + SKJ + HG. Site supervisor should indicate approximate
value and quantity of the materials in the requisition.
c. SSJ will ensure that all suppliers' bills pertaining to all supplies of construction
materials are submitted with supporting vouchers/slips immediately after supply.
Payment shall be made immediately (must be instructed) with the approval of
SKJ. No claim will be entertained nor payment shall be made in respect of any
supply, bill/slip etc. remaining uncovered under the bills already submitted. No
bill should be delayed beyond two weeks from the date of supply. In case of any
delay, payment will be made only after getting the approval of HG.
d. It will be the sole responsibility of all supervisors concerned to ensure that
labourers working under them do not misbehave, absent from or shirk work. In
such an event, they should take action by marking them absent or dismissing the
worker and also reporting to SSJ, who should take severe action failing which
they should be punished by SKJ/HG.
e. The security staff on duty will be responsible for entry of all company materials
(truck etc.) in his book while coming into the campus. The book maintained shall
show details of materials coming in, vehicle No., time-in and time-out. This book
will be signed by staff on duty (Inspector and above). He will give entry book to
Cashier only whenever he asks for the same. Cashier will take the sheet in the
book on completion of entries (on both sides of each sheet).
f.
All will ensure first class construction with due economy and completion as per
schedule at various stages. It should be more suitable from functional point of
view than ornamental/ decorative.
g. SSJ will obtain from the Architect and Structural Engineer, all designs, drawings,
layout details
(duly approved by AD/DM/NM) before commencement of work to
avoid unnecessary breakage/alterations. Work distribution for skilled labourers
will be planned from time to time and shall be followed strictly. He should also
check the works while in progress, give suggestions, solve problems and in case
of any deviation, report to SKJ.
h. Cement Godown shall be under the control of stores. Cement should be stored
separately under lock and key and proper account should be maintained by
Store Manager for issue/use of cement bags. Cement bags should be issued
maximum twice in a day by any of Store staff and they should ensure that there
is no wastage of the same. SSJ to maintain separate book at site for cement
bags issued/used in a day and lying unused at the site. SKJ/HG should conduct
11
surprise check cement stock at the site at least twice a month.
i.
SSJ should send empty cement bags to the stores in-charge and then the
Disposal Committee of JAL D/F will dispose of the same at best possible rates, if
such cement bags are available for disposal
(since we are using the empty
cement bags for dross filling etc).
All should do their work honestly and sincerely. Any misuse or misappropriation
will be a sin and God will certainly punish such persons.
k. Whenever carpenters, masons and others are engaged for doing any work, the
rate should be fixed jointly by SSJ
+ SKJ/HG must ensure that all labour
engaged are above 18 years of age, besides the wages should be fixed as per
their skill, age and efficiency.
I.
SSJ shall pass all bills of construction items technically which are received in JAL
D/F stores as well as. They will then forward the bills to Stores Dept.
m. All miscellaneous repairs and maintenance works pertaining to JAL D/F campus
will be attended by and will maintain separate records indicating nature of work
done, approximate cost involved etc. Print out in the form of register for
approximate cast of work taken from ERP Data Entry Window shall be circulated
to SSJ/SKJ monthly.
n. SSJ will prepare estimates for new works/projects. Estimates for new
projects/works shall be prepared by SSJ, checked by SKJ and approved by HG.
o. SKM/SSJ will arrange fabrication of wooden/steel/aluminium/upholstery items
departmentally or by engaging contractors in consultation with SSJ/Sathesh.
SKJ/HG will keep check.
p. SSJ/Sathesh for JAL D/F and will be responsible for the quality of fabrication
items such as doors, windows, reinforcement rods etc. As per necessity, SSJ
should visit the fabrication places apart from the routine spot inspections. SKJ
should also visit and check.
q. SSJ for JAL D/F will be responsible for concreting works and should be present
for roof concrete work without fail. They should check centering, shuttering works
and steel rods positions as per drawing before concrete work starts. Supervisor
should not allow the contractor for roof concreting without checking of SSJ."
(Ashok Kumar Agrawal)
DGM- Finance & Taxation